NASA successfully integrates telescope and instruments for Roman space mission


The telescope and scientific instruments for NASA’s Nancy Grace Roman Space Telescope have been successfully integrated at the Goddard Space Flight Center in Greenbelt, Maryland. This integration is an important step in the development of the mission, as the payload will soon be attached to the spacecraft. According to NASA officials, this milestone ensures that the observatory is on track for its projected completion by the end of 2026 and its scheduled launch no later than May 2027.

Major Payload Components Assembled

Reports indicate that the payload consists of three primary components: the Wide Field Instrument, the Optical Telescope Assembly, and the Coronagraph Instrument. The Wide Field instrument, described as a 300-megapixel infrared camera, will enable researchers to capture high-resolution, panoramic images of the universe at unprecedented speed. The optical telescope assembly consists of a 2.4-meter primary mirror and an advanced system of nine additional mirrors, engineered for exceptional stability.

The Coronagraph instrument, a technology demonstration, is designed to study exoplanets by suppressing starlight and enabling observations of planets orbiting other stars. The integration of these instruments aims to provide precise measurements of phenomena such as dark energy, dark matter, and cosmic structures in time and space.

Mission moves forward amid assembly milestones

According to statements from NASA Goddard systems engineer Jody Dawson, the team is focused on adding integrated payloads to the spacecraft before the year ends. Simultaneously, work is in progress on other mission elements, including the installation of solar panels and the deployed aperture cover, which will protect the telescope from unwanted light during operation.

Senior project scientist Julie McNairy shared with media outlets that the telescope’s capabilities will greatly advance astronomical research, allowing faster and more detailed sky surveys than previous missions. Assembly and testing are expected to continue over the coming year to meet the targeted timelines.



Source link

Leave a Reply

Your email address will not be published. Required fields are marked *